Amazon New Carlisle

Operating · Documented · Location confirmed

Operating and still expanding. Amazon says Project Rainier is fully running and names St. Joseph County as a site. Epoch AI estimates Buildings 1 to 18 were running by Oct. 19, 2026. Further buildings are in air permit review.

Operator

Amazon Data Services, Inc. (Amazon Web Services). Epoch AI says Anthropic uses the chips here

Location

31100 Edison Rd, New Carlisle, IN 46552

East of New Carlisle, St. Joseph County, Indiana. The point is the Census geocode for the address on Indiana's air permit for one of two permitted sources; that permit first listed 55001 Larrison Blvd. The second source is at 31100 State Road Highway 2. A state wetlands notice places construction south of IN-2 and Strawberry Road, at 41.663508, -86.471132. Footprint links that notice to the second source through the shared project name SBN 201.

Power

  • Estimated electrical use: 1,037 MW (Epoch AI estimate)

The New York Times reported in June 2025 that the complex will use 2.2 GW. Amazon's own post gives no power figure.

Epoch AI projects 1,925 MW of IT power in early 2028. It reads a May 2026 air permit filing as pointing to 2.3 GW total facility power.

Backup generators give a sense of scale but not power use. Footprint's arithmetic from the state permits: 238 units at Edison Rd and, if the draft is approved, 640 at State Road 2, each 2,750 kW, about 2,415 MW in all.

Indiana Michigan Power is the sole power provider, and two substations are being built on site, ABC57 reports. Amazon says both campuses run on the regional grid. No utility filing naming a figure for this site has been read.

  • 1,037 MW IT power, Epoch AI estimate

Power connection

On-site backup, from state air permits. Source 141-00642 at 31100 Edison Rd: 238 diesel critical emergency generators of 2,750 kW each. Source 141-00650 at 31100 State Road Highway 2: 234 of the same size, plus a draft that would add 406 more for a new building, SBN210.

Cooling

Mostly outside air, per Amazon: no cooling water from October to March, and only a few hours a day on an average day from April to September. Epoch AI also describes direct air-based cooling with no external cooling plant.

Water

The New York Times reports municipal water is used to cool the air in hot months and millions of gallons a year. A local agreement caps Amazon and GM's combined use at 24 million gallons a day from the Kankakee Aquifer, which a county commissioner said has a safe yield of 44.5 million.

Community

Amazon says its permit applications cover 911 generators across the two campuses, used about ten hours a year on average for tests and maintenance. Those are Amazon's figures.

IDEM wrote to Amazon in June 2026 about air permit violations: two generators of 1,600 kW where 1,500 kW was approved, a missing construction affidavit and failed exhaust sensors. IDEM took no legal action. Amazon called the generator issue an "administrative error".

IDEM told Amazon in 2025 to stop construction in state waters over wetlands affected without authorization. Amazon's new application would permanently fill 4.94 acres of wetland and affect 3,986 feet of streams, with on-site wetland creation and purchased stream credits as mitigation.

Dewatering: the county drainage board approved up to 31 million gallons a day in May 2026, down from the 35 million requested, with monitoring on Niespodziany Ditch. Farmers had raised concerns about flooding.

Dry wells: residents east of town blame construction pumping. Indiana's DNR says drought is a factor and that groundwater levels are consistent with history. A Notre Dame hydrologist told ABC57 both drought and pumping are causing the effects. The DNR did not provide its studies to ABC57.

The county approved the project 7-2 in August 2024. WVPE puts the property tax abatement at about $4 billion over 35 years. Four council Republicans asked Amazon in 2026 to give some back; Amazon declined an interview and points to 900 hires and $7 million in road work.

Don't confuse with a separate $13 billion rezoning near New Carlisle that the county council rejected 7-2 in December 2025. WVPE says that proposal came from a New York-based developer, on farmland along Chicago Trail north of town, and that its attorney distinguished it from Amazon's. It is not this campus.

Notes

Amazon says Project Rainier has nearly half a million Trainium2 chips across several US sites, built with Anthropic. Anthropic makes Claude, the AI used to compile these records.

The New York Times reported about 1,200 acres and about 30 planned buildings. The original $11 billion tax deal promised 16 buildings.

More in Indiana

Sources

Last checked 2026-11-05.