Bridge Data Centres MY06 (Sedenak)

Operating · Documented · Location approximate

Phase 1 opened in October 2022. Epoch AI's satellite review shows Buildings 5 to 7 running and says Buildings 8 to 10 looked unused in September 2026. That is a research estimate.

Operator

Bridge Data Centres. Anchor tenant: ByteDance System Sdn. Bhd., per Malaysia's investment agency in 2022

Location

Sedenak Tech Park, Kulai, Johor

Kulai district, Johor. The point comes from a street-view location Epoch AI links for the MY06-2 campus. It does not mark a street address.

Power

  • Design capacity: 110 MW
  • Estimated electrical use: 243 MW (Epoch AI estimate)
  • 243 MW IT power, Epoch AI estimate
  • About 221,000 H100 equivalents Compute, Epoch AI estimate

Power connection

Grid: Tenaga Nasional (TNB) says it spent RM1.2 million upgrading installations at its Sedenak main intake substation to supply electricity to "Bridge Data Centre" in September 2022. The release doesn't name MY06, but it was issued days after MY06 opened and describes Sedenak Tech Park.

Water

A freshwater source, according to Bridge staff quoted by The Star. The company's reclaimed water goes only to its Ulu Tiram site.

Notes

In 2022 the agency described Bridge as a subsidiary of Chindata Group. Footprint hasn't checked the current ownership.

Epoch AI lists ByteDance as the likely owner and user, and includes the site in its AI data center directory, which is why it is marked as an AI site.

Sources

Last checked 2026-11-04.