Operating · Documented · Location approximate
Microsoft says the Atlanta site began operating in October 2025. Epoch AI estimates four buildings were running by June 2026.
Microsoft (tenant, per Epoch AI). Developer: QTS, a Blackstone subsidiary, which does not disclose customers
QTS campus, Fayetteville, Fayette County, Georgia. Microsoft told the AJC the site is in Fayetteville but gave no location. The point is the Census geocode for 1435 Hwy 54 West, the address on QTS's state air permit, rounded. Tying Microsoft to this campus rests on the AJC's records and Epoch AI, not a Microsoft document.
Microsoft says the Atlanta site was "selected with resilient utility power in mind" and that highly available grid power lets it "forgo traditional resiliency approaches for the GPU fleet (such as on-site generation, UPS systems and dual-corded distribution)". It gives no power figure.
Microsoft's statement covers the GPU fleet. QTS's state air permit file for this campus covers diesel generators. Georgia's review describes 205 emergency generators of 2.5 or 2.25 MW for a six-building data center, with a limit of 670,000 gallons of diesel a year. A September 2026 state notice lists an application for more. The documents do not name Microsoft or say which buildings the units serve.
Epoch AI lists 672 air-cooled chillers with 795 MW of total cooling capacity. Epoch lists this under cooling, separately from its IT power estimate.
Closed-loop liquid cooling with chillers, per Microsoft, which says it uses "almost zero water" in operation. Epoch AI identifies air-cooled chillers from imagery.
Microsoft says Fairwater Atlanta's initial fill equals what 20 homes use in a year. Fayette County Water System serves the QTS campus, according to the county. QTS says each finished building will use about what four households use each month.
Water billing dispute on the QTS campus: a May 2025 county letter said a line was installed without the county's knowledge. The county later said the letter was unclear and blamed a smart meter switch that left meters off billing. It says QTS paid promptly at a higher rate, about $147,000 by The Citizen's report.
Billing records show one line delivered 20.6 million gallons since February 2024 and 109 million across 13 lines, according to Atlanta News First. QTS says it is construction water. The county says QTS uses under 1% of its supply and does not affect residential water pressure. A resident's low pressure complaint set off the review.
These water facts are about QTS's campus, which is planned for up to 13 buildings, and not specifically Microsoft's. Residents also cite noise and tree clearing.
A Fayette County Development Authority official told the AJC "we would like for the community to realize the benefits before we move forward on any more."
Location conflict: Rough Draft Atlanta, citing Microsoft, placed the site in South Fulton County near Palmetto. The AJC reports Microsoft saying Fayetteville. Footprint follows the AJC and Epoch AI.
The AJC reports records show the city issued a certificate of occupancy for the first QTS building in May 2025, and describes the campus as 615 acres with Microsoft's facility at over 1 million square feet.
Fayetteville approved the development agreement for up to about 7 million square feet in June 2023, on 612 acres, according to The Citizen.
Microsoft calls this the second site in its Fairwater family, two stories, linked by dedicated fiber to Wisconsin. Epoch AI says it likely provides training compute for OpenAI.
Last checked 2026-11-05.