Operating · Documented · Location approximate
The first building, Fairwater, became operational in 2026: Epoch AI dates it to April from a Microsoft post, and WPR reported it operational in June. A second data center is expected to be finished in 2028. In October 2026 the village Plan Commission approved Microsoft's amended plan for seven data centers instead of nine.
Microsoft. Epoch AI lists Microsoft as the chip owner and OpenAI and Microsoft as likely users
Near 90th Street and County Road KR, Mount Pleasant, Racine County, Wisconsin. No Microsoft document read gives a street address. The point is FracTracker's location for this listing, rounded.
Microsoft gives no power figure for the site. It says it is prepaying for energy and electrical infrastructure, will match fossil-fuel power it uses with carbon-free energy, and is building a 250 MW solar project in Portage County. It works with WE Energies.
Grid planning: Epoch AI reports MISO planned 1,480 MW of load for Microsoft in Mount Pleasant in 2026. That is a planning figure from Epoch's page, not a Footprint reading of MISO's documents, and not use.
Backup: Microsoft says its Wisconsin datacenters' backup generators are designed to run on a renewable biofuel.
Microsoft says more than 90% of the facility uses closed-loop liquid cooling, and the rest uses outside air, switching to water only on the hottest days.
Microsoft says annual water use is about what a typical restaurant uses in a year. It gives no gallon figure.
Noise lawsuit: three nearby residents filed a class action in July 2026 over a constant low hum they say has come from the site since it went online in April, FOX6 reports. They say about 1,000 residents within roughly a mile and a half are affected. A neighbor on the same block said the running facility doesn't bother him. Microsoft said it is "committed to being a good neighbor".
Other concerns residents have raised include construction noise and dust, light pollution, traffic and the changing rural landscape, WPR reports.
Incentive: Microsoft is redirecting up to $5 million a year in village incentives it became eligible for, $4.9 million to the village and about $100,000 to the county economic development group, WPR reported in September 2026. The village president said the money would go to lowering property taxes.
Microsoft calls it "the world's most powerful AI datacenter", with hundreds of thousands of NVIDIA GPUs. It pledged $3.3 billion, then $4 billion more for a second datacenter of similar size.
Amended plan: seven data centers instead of nine, but more building space, over 5.8 million square feet, plus an office and storage building, a guardhouse and two substations. Microsoft said the changes "in no way reflect a reduction in our ambition." The village board was expected to vote later in October; Footprint hasn't confirmed that vote.
More than 550 employees work on the campus, WPR reports. Microsoft also plans a project on about 240 acres in Kenosha, about 8 miles away.
Why this is marked as AI: Microsoft describes it as an AI datacenter.
Last checked 2026-11-16.