Meta Prometheus (New Albany)

Operating · Documented · Location approximate

Meta describes Prometheus as a 1 GW cluster across several buildings, weatherproof tents and nearby colocation sites. The AP reported in January 2026 that it was expected to come online in 2026. Epoch AI's satellite timeline estimates Building 1 running from October 2025 and Buildings 2 to 10 running by August 2026, with more under construction.

Operator

Meta. The power plants' customer in Ohio siting filings is Sidecat LLC, a Meta affiliate

Location

New Albany International Business Park, New Albany, Ohio, in Licking County. Epoch AI describes the cluster spanning the length of the business park. No source read gives a street address for Prometheus. The point is FracTracker's location for this listing, rounded.

Power

Meta says Prometheus "will be a 1-gigawatt cluster". That is Meta's description of the cluster's size, not measured use or a grid request.

Nuclear deals: in January 2026 Meta announced agreements with TerraPower, Oklo and Vistra, including more than 2.1 GW from two operating Ohio nuclear plants, the AP reports. Meta says the projects add power "to the grid"; the report doesn't say how much reaches this site.

  • 471 MW now; 1,022 MW projected by Q3 2028 IT power, Epoch AI estimate

Power connection

On-site gas, approved: the Ohio Power Siting Board approved Will-Power OH's 200 MW Socrates North gas plant (Case 25-188-EL-BGN) on 20 acres in the business park in September 2025. The board says it will run "behind-the-meter" to serve an adjacent data center and "will not be physically connected to the electric power grid"; Sidecat, a Meta affiliate, will use the power. Williams, Will-Power's parent, lists a sister 200 MW Socrates South plant, targeted for Q3 2026, and Socrates North for Q4 2026.

Notes

Meta's engineering post describes Prometheus as spanning "five or more data center buildings in a single data center region", using weatherproof tents alongside traditional buildings.