Operating · Documented · Location confirmed
Stream says two of seven planned buildings are complete and serving tenants. The other five are in development.
Stream Data Centers. Tenants not named in sources read
2950 S. Litchfield Road, Goodyear, AZ 85338
Goodyear, Maricopa County. The point comes from the Census geocoder and marks the address, not the building outline.
Dedicated on-site APS substation, with an "ultimate power capacity of 480 MW," per Stream. Stream's case study says it built the substation and that it also gives a neighboring site a path to the grid.
Stream says "our design uses air-cooled chillers with a closed-loop water system" that "gets filled once." Epoch AI counts 62 air-cooled chiller units from imagery, but also says the older non-AI building (PX1) had cooling towers added, which would use evaporation. The two don't fully line up.
No supplier or figure found. Stream's claim: "Typical daily water use is similar to or less than an office building of equivalent size."
Listed in Epoch AI's AI data center directory, which gives the owner as unknown and names no tenants.
Last checked 2026-11-04.