Stream Data Centers PHXA (Epoch AI: Stream Phoenix)

Operating · Documented · Location confirmed

Stream says two of seven planned buildings are complete and serving tenants. The other five are in development.

Operator

Stream Data Centers. Tenants not named in sources read

Location

2950 S. Litchfield Road, Goodyear, AZ 85338

Goodyear, Maricopa County. The point comes from the Census geocoder and marks the address, not the building outline.

Power

  • Design capacity: 280 MW
  • Estimated electrical use: 64 MW (Epoch AI estimate)
  • 64 MW now; 220 MW projected for early 2030 IT power, Epoch AI estimate

Power connection

Dedicated on-site APS substation, with an "ultimate power capacity of 480 MW," per Stream. Stream's case study says it built the substation and that it also gives a neighboring site a path to the grid.

Cooling

Stream says "our design uses air-cooled chillers with a closed-loop water system" that "gets filled once." Epoch AI counts 62 air-cooled chiller units from imagery, but also says the older non-AI building (PX1) had cooling towers added, which would use evaporation. The two don't fully line up.

Water

No supplier or figure found. Stream's claim: "Typical daily water use is similar to or less than an office building of equivalent size."

Notes

Listed in Epoch AI's AI data center directory, which gives the owner as unknown and names no tenants.

More in Arizona

Sources

Last checked 2026-11-04.

More data centers in Arizona