Data Center Footprint

Sites By State News & Findings About
Sites By State News & Findings About

Data centers in Arizona

10 researched sites, each with its sources and the date it was last checked.

  • Microsoft Goodyear campus (PHX10-11): Operating, Documented
  • Microsoft El Mirage campus: Operating, Documented
  • Stream Data Centers PHXA (Epoch AI: Stream Phoenix): Operating, Documented
  • Meta Mesa Data Center: Operating, Documented
  • Google Mesa data center: Operating, Documented
  • Apple Mesa global data command center: Operating, Documented
  • Tract Buckeye technology park (Buckeye Tech Corridor): Proposed, Reported
  • Hassayampa Ranch data center: Proposed, Reported
  • Project Blue: Under construction, Documented
  • Price Road Innovation Campus (rejected): Cancelled, Documented

Findings with evidence here

  • Almost no one publishes how much power a site really uses
  • Grid limits are shaping what gets built, and where
  • "Clean energy" often means a contract, not the power running the site
  • Local fights can stop a project, but not always for good
  • Designs are moving away from water cooling, but water use stays hard to see

See the full map

Layers and key