Almost no one publishes how much power a site really uses

Sources give planned capacity, grid requests and purchases far more often than what a site draws, so the electrical use figures on this map are estimates. These are the closest things to a measurement we found.

The evidence

  • Apple Mesa global data command center: Apple reports 563 million kWh at Mesa in fiscal 2025, about 64 MW if spread evenly over the year (Footprint arithmetic).
  • Meta Mesa Data Center: Meta reports 24,657 MWh at Mesa in 2024, before the site went online.
  • Colossus 1: MLGW said 150 MW was reaching the site in May 2025. That is supply on one date, not measured use.
  • Colossus 2: xAI's sworn declaration gives the expected power draw of its GPUs, but the number is blacked out in the public copy.