Meta Mesa Data Center

Operating · Documented · Location approximate

Meta says the site went online in 2025. The campus plan is five buildings; how many are running isn't in the Meta and city documents read.

Operator

Meta

Location

Elliot Road Technology Corridor, southeast Mesa, Maricopa County. The point is a rough mark on the corridor near Elliot and Ellsworth roads. No source opened gives the parcel.

Power

Meta reports 24,657 MWh of electricity at Mesa in 2024, the first year with a figure. That was before the site went online, so it says little about full use.

Meta says three Arizona projects add 450 MW of solar to the grid. That is a clean-energy purchase, not a documented connection to this site.

Power connection

Salt River Project is "the electric utility provider for the project," per the City of Mesa.

Cooling

Meta says the site uses "cooling technology that is significantly more water efficient than the industry standard," and said in 2021 it would use 60% less water than a typical data center by relying on fresh-air cooling. Those are company claims. The system type isn't stated.

Water

City of Mesa water service, under a Sustainable Water Services Agreement. Mesa says Meta can transfer 1.79 billion gallons of long-term storage credits to the city "to offset the Meta facility's anticipated water use for the next 20 years." Measured: Meta reports 57 megaliters withdrawn at Mesa in 2024 (about 15 million gallons, Footprint arithmetic), before the site went online and not counting construction water.

Community

Mesa's council approved the project 6-1 in 2021. Vice Mayor Jenn Duff voted no, saying Arizona's groundwater was being depleted too fast. She said the site would use 1.75 million gallons a day for cooling at full operation. Those are her pre-construction figures and an undated report, not measurements. Another report has a council member saying up to 1 million gallons a day.

Notes

A 396-acre, 2.5 million square foot campus. Epoch AI's directory has no entry for it.

Meta says it will "restore 200% of the water consumed by the data center to local watersheds" in Arizona and has supported 12 restoration projects. In 2021 it said it would restore over 200 million gallons a year. These are company claims about offsets elsewhere in the basin, not reduced use at the site.

Related

More in Arizona

Sources

Last checked 2026-11-04.

More data centers in Arizona