Last checked 2026-11-05. Compiled with AI help and checked against the linked documents.
Colossus 1 has two sources of power: the local grid and 15 permitted natural gas turbines, with batteries as well. Footprint hasn't found a published figure for its actual electricity use. The figures on record measure different things, so they shouldn't be added together or compared directly.
Colossus 1 is at 3231 Paul R. Lowry Road, in the Frank C. Pidgeon Industrial Park in southwest Memphis, Tennessee, beside the historically Black community of Boxtown. xAI, now also called SpaceXAI, runs it. The air permit is held by CTC Property LLC, an xAI affiliate.
Memphis Light, Gas and Water (MLGW) said in May 2025 that the site was receiving 150 MW from the grid through two substations, one existing and one newly built at xAI's expense. That is the supply on that date, not measured use.
The grid request is 300 MW, made as two 150 MW steps. TVA's board approved a further 150 MW in February 2026, subject to conditions. The report of that vote doesn't name the site, but MLGW's CEO separately said Colossus would rise from 150 to 300 MW.
A Shelby County air permit, No. 01156-01PC, covers 15 natural gas turbines of 16.48 MW each, or 247.2 MW combined. It runs from July 2, 2025 to January 2, 2027. That figure is the size of the permitted turbines. It doesn't show how much they run.
SpaceX's SEC filing says the site buys grid power as available, and relies on its own generation and Megapack batteries when grid power is curtailed.
The turbines have been disputed. The NAACP's lawyers say up to 35 were found running before the county issued the permit. The NAACP and Young, Gifted & Green appealed the permit in July 2025. The county's Air Pollution Control Board dismissed the appeal as moot in December 2025.
SpaceX's filing also says Colossus and Colossus II together provide about 1.0 GW of compute power. The filing's Colossus II covers both Tulane Road (Colossus 2) and Stateline Road (MACROHARDRR). xAI's sworn declaration says the Stanton Road turbines in Southaven power both.
Footprint hasn't found a published figure for Colossus 1's actual electricity use, or for how much of its power comes from the grid and how much from turbines at any given time. Footprint's other records show the same gap, and on-site gas shows up at other sites. Those are selected sites, not a representative sample, so they don't show how common either is.
The date to watch is January 2, 2027, when the turbine permit expires. Footprint has found no renewal yet.
In May 2026, SpaceX entered cloud services agreements giving Anthropic access to computing capacity across Colossus and Colossus II, according to its SEC filing. Anthropic makes Claude, the AI used to compile Footprint's records.