MACROHARDRR

Operating · Documented · Location confirmed

Operator

xAI (SpaceXAI)

Location

2400 Stateline Road W., Southaven, MS 38671

Southaven, DeSoto County, Mississippi, former GXO Logistics warehouse

Power

xAI's sworn court declaration gives the expected power draw of the GPUs at this site and Colossus 2, but that figure is blacked out in the public copy.

SpaceX's SEC filing gives compute power for this site and Colossus 2 together, not separately. See the Colossus 2 record.

  • Almost 2 GW Training compute across xAI's Memphis-area sites, Elon Musk's claim on X

Power connection

Powered by the Stanton Road gas turbines, 2875 Stanton Road, Southaven. xAI's sworn declaration: "The Stanton Road site supplies power to the Tulane Road and Stateline facilities." As of June 2026, xAI's staff said the temporary turbines there were the only available power source for these two sites. SpaceX's SEC filing says Colossus II, which includes this site, "is capable of operating entirely by our self-built behind-the-meter gigawatt-scale natural gas power plant".

Cooling

Direct-to-chip cooling, per SpaceX's SEC filing, which says this of all its existing data centers.

Community

Mississippi's governor announced the project on Jan. 8, 2026, as a more than $20 billion investment, with state tax incentives and local fee-in-lieu agreements.

The Safe and Sound Coalition has circulated a petition to halt further development in the area. Nearby residents have complained about turbine noise.

MDEQ issued notices of violation in August 2026 over land disturbed without stormwater permits at three Southaven sites, including this one. A company SEC filing puts potential penalties at about $6.1 million for all three, as a preliminary estimate. Footprint has read reports of this, not the notices.

Spill at the Stanton Road power site, which supplies this site: between 5,000 and 6,000 gallons of DOWFROST HD, a propylene glycol heat transfer fluid, escaped from a tank into a nearby drainage ditch, MDEQ told FOX13 in a Nov. 15, 2026 report. xAI said a contractor set up a hose on a mobile tank wrongly and that the release was stopped quickly. MDEQ said there was no immediate threat to public health or safety and that cleanup would go on for several more days, with xAI responsible.

Notes

Also called Colossus 3 in NAACP filings and press coverage. SpaceX's SEC filing counts the Tulane Road and Stateline Road sites together as "COLOSSUS II". A warehouse of about 810,000 square feet.

The building is a former GXO Logistics warehouse, per CNBC.

In May 2026 SpaceX entered cloud services agreements giving Anthropic access to computing capacity across Colossus and Colossus II, according to its SEC filing. xAI's sworn declaration also names Cursor and Google as users of the Tulane Road and Stateline Road sites. Anthropic makes Claude, the AI used to compile these records.