Gas generation beside data centers shows up in three countries
These sites have their own gas generation, running, permitted or planned, in the US, Ireland and Mexico. Some companies call it temporary or backup. At others it is described as the main supply.
The evidence
Colossus 1: 15 gas turbines under a county air permit, 247.2 MW combined.
Colossus 2: Powered by the Stanton Road gas turbines. xAI's staff said in June 2026 they were the only available source for this site and Macrohardrr.
MACROHARDRR: Powered by the same Stanton Road turbines.
Vantage VA2: Eight permitted gas turbines, 132 MW of rated capacity (Footprint arithmetic). Local reporting says the campus runs on them with no grid connection.
OpenAI Stargate Abilene: Crusoe describes a 350 MW gas plant at the site. Oracle says it will ultimately be used for backup.
Vantage DUB 13 (Profile Park): Ireland's planning board refused this building, saying it wasn't satisfied that on-site gas wouldn't become the primary energy source.
Microsoft data center (Colón, Querétaro): Rest of World reports that Mexico's environment ministry approved seven gas generators to cover 70% of the site's energy.