EdgeConneX DUB 06 (Ballymakaily, Lucan)

Proposed · Documented · Location approximate

An Coimisiún Pleanála granted permission on July 31, 2025. Footprint found no source showing that work has started on these two buildings. The order calls them the third and final phase on a wider landholding that is already in use.

Operator

EdgeConneX Ireland Limited

Location

Townland of Ballymakaily, west of Newcastle Road (R120), Lucan, Co. Dublin

South Dublin. The point marks the R120 road near the townland, from OpenStreetMap. It does not mark the buildings.

Power

  • Design capacity: 30 MW

The Commission's inspector records the applicant's statement that EirGrid's conditional "Flexible Demand" offer requires on-site generation able to run for long periods, estimated at up to 500 hours a year during winter peaks. The applicant chose gas engines for this.

Power connection

Grid: the Commission was satisfied that the applicant has a fixed connection agreement to connect to the grid, so the building is not an "islanded" development. The inspector's report describes a connection through a 110 kV EirGrid substation permitted under ABP-314567-22.

On-site generation: the order refers to the Power Plant that will serve this data centre, under permission SD22A/0289. The inspector's report describes three gas plants permitted on the campus under SD21A/0042, with 20, 20 and 21 generator units. Footprint found no megawatt figure for them.

Cooling

Mechanical cooling units on the roofs, per the inspector's report.

Water

Mains water, per the inspector's report. No volume is used in this record.

Community

South Dublin County Council refused the plan in July 2023, citing the lack of a fixed grid connection agreement, gas reliance, no power purchase agreements and the loss of green infrastructure. The Commission overturned that refusal.

Notes

Decision: grant with conditions, dated July 31, 2025. The inspector's report calls the two new data halls DUB 06.

Conditions: the 24 standby generators must run on renewable fuel, with a restriction on fossil diesel, and the company must sign a renewable power purchase agreement before the buildings start operating.

This is a major campus.

Related

Sources

Last checked 2026-11-04.