OpenAI Stargate Shackelford (Vantage Frontier)

Under construction · Documented · Location approximate

A state filing lists construction from Oct. 20, 2025 to Feb. 15, 2027 for one building. Epoch AI's imagery from Sept. 2026 shows Buildings 1 to 5 roofed.

Operator

Vantage Data Centers, with VoltaGrid for power, for Oracle and OpenAI

Location

Shackelford County, east of Abilene, near FM 604 and Highway 351. The point marks the coordinates TCEQ gives for the VoltaGrid power plant by the campus, rounded. A state building filing lists 246 PR 1604 for one building, which the Census geocoder could not place.

Power

  • Planned size, estimated: 1,400 MW (Epoch AI estimate)

Epoch AI cites Vantage as reporting 1.4 GW of IT power. Vantage's own campus page and release were not readable, so this figure is not in the design field.

VoltaGrid's TCEQ application covers Jenbacher J620 and J624 gas engines and proposes up to 10,627,597 tons a year of CO2 equivalent. TCEQ's summary says the power is for "a nearby data center" and does not name it. The summary says figures may change during review.

VoltaGrid's plant is at 299 FM 604, Abilene, Shackelford County, under proposed permit 182467, submitted Dec. 12, 2025.

  • 1,400 MW Projected IT power, Epoch AI estimate

Power connection

On-site generation: Oracle's fact sheet names VoltaGrid as a partner and says "The data centers are powered by an onsite, behind-the-meter, gas-powered microgrid utilizing Jenbacher reciprocating engines."

Cooling

Closed-loop chillers, per Oracle's fact sheet.

Community

Shackelford County commissioners approved a reinvestment zone and intent to sign a tax deal in July 2025. Vantage would pay $10 million a year in place of property taxes for 10 years, according to The Albany News. The site is in Clyde ISD, so Albany ISD gets no direct tax benefit. Footprint has not read the agreement.

Notes

Oracle's fact sheet says 10 buildings on 700 acres; The Albany News and Epoch AI say about 1,200 acres.

Oracle's fact sheet said the first building would be delivered in the second half of 2026. That is a company forecast from 2025. Epoch AI projects Building 1 operating in August 2027.

The TDLR filing read for this record is project "Vantage DC Abilene - TX3 - Project Frontier", facility TX305, $955 million, 344,796 sq ft. The address says Building 5, while Epoch AI treats this filing as Building 1.

State permit pause: Gov. Greg Abbott told TCEQ on Sept. 21, 2026 to issue no permits sought by data center projects until ERCOT and Texas Water Development Board audits are done. TCEQ wrote on Oct. 19 that it had paused issuing all permits for infrastructure directly supporting data centers and was screening pending applications. Footprint hasn't found whether VoltaGrid's application 182467 has been paused under the directive.

Related

More in Texas

Sources

Last checked 2026-11-11.