Data centers in Texas

16 researched sites, each with its sources and the date it was last checked.

  • OpenAI Stargate Abilene: Operating, Documented
  • Crusoe Abilene expansion (Microsoft): Under construction, Documented
  • OpenAI Stargate Shackelford (Vantage Frontier): Under construction, Documented
  • Core Scientific Denton (CoreWeave): Operating, Documented
  • Google Midlothian: Operating, Documented
  • Google Red Oak: Operating, Documented
  • Meta Temple: Operating, Documented
  • Helios campus (CoreWeave): Operating, Documented
  • Goodnight campus: Under construction, Documented
  • Riot Corsicana: Operating, Documented
  • Riot Rockdale: Operating, Documented
  • Project Matador: Proposed, Documented
  • Highlander San Marcos data center: Cancelled, Reported
  • Project Patriot (Knox Ranch): Proposed, Reported
  • MARA Granbury bitcoin mine: Operating, Reported
  • Meta El Paso data center (Project Seafox): Under construction, Documented

Findings with evidence here

  • Gas generation beside data centers shows up in three countries
  • Grid limits are shaping what gets built, and where
  • "Clean energy" often means a contract, not the power running the site
  • The name on the paperwork often isn't the company behind the site
  • In Texas, bitcoin mines are becoming AI sites
  • Local fights can stop a project, but not always for good
  • Designs are moving away from water cooling, but water use stays hard to see