Google Midlothian

Operating · Documented · Location approximate

Operating, with a fifth building filed with the state. Reports say it is due by February 2027.

Operator

Google. Filings and zoning records use the name Sharka (Sharka LLC, Sharka Data Center)

Location

Railport Parkway, Midlothian, Ellis County. The point marks 3441 Railport Parkway, the address news reports give for the fifth building. Other sources give 3800 and 3250 Railport Parkway, and Footprint has not read the state filing.

Power

  • Estimated electrical use: 103 MW (Epoch AI estimate)
  • 103 MW IT power, Epoch AI estimate

Cooling

Evaporative cooling at the existing site, with the expansion to be closed-loop air-cooled, according to information Google gave FOX 7.

Community

Google's own report lists Midlothian's 2024 water use: 221.0 million gallons withdrawn, 38.7 million discharged, 182.3 million consumed.

In June 2026 Google launched a $10 million Texas water fund for communities where it wants to build, as residents raised concerns about water use.

Notes

Name mismatch: Midlothian's zoning ordinance 2022-63 covers the "Sharka Data Center" and does not name Google. News reports describe Sharka as a Google company.

Why this is marked as AI: Epoch AI's AI directory lists this site, estimating Google TPU chips.

Google publishes an efficiency (PUE) figure for Midlothian, which shows the site running.

Filing details come from news reports of state filings: fifth building, about $880 million and 288,000 sq ft.

Google announced the site in 2019 as a $600 million investment.

Related

More in Texas

Sources

Last checked 2026-11-04.

More data centers in Texas