Designs are moving away from water cooling, but water use stays hard to see
Most records have no documented water source. Newer plans often promise air or closed-loop cooling, sometimes after a fight over water. Those are design claims, and measured figures are rare.
The evidence
Microsoft Goodyear campus (PHX10-11): The city's spokesperson said Microsoft's water use "is proprietary to Microsoft and cannot be shared by the city."
Google data center "Teros" (Canelones): The first plan was reported at up to 7.6 million liters a day. The approved design uses air-cooled chillers, with an estimated 48.1 cubic meters a day.
Project Blue: Beale now claims no water for industrial cooling, though its state-approved wells are capped at about 31.4 million gallons a year. The original plan relied on reclaimed water.
Google Midlothian: Google says the existing site uses evaporative cooling and the expansion will be closed-loop air-cooled.
Google Bristow: The cooling information comes from Epoch AI counting 40 evaporative towers in satellite images.