Microsoft Goodyear campus (PHX10-11)

Operating · Documented · Location approximate

Microsoft says it operates data centers in Goodyear and is building new ones. Epoch AI's satellite reading puts four buildings in operation and foundations under way for two more in April 2026.

Operator

Microsoft

Location

14250 W Broadway Rd, Goodyear, AZ 85338 (street number from Epoch AI only; the Census geocoder did not match it)

South of MC 85 and Phoenix Goodyear Airport. A county dust permit for Microsoft's PHX10-11 road work names W Broadway Rd and S Bullard Ave. The point marks the 14000 block of W Broadway Rd, from neighboring Census address matches.

Power

  • Estimated electrical use: 202 MW (Epoch AI estimate)

Microsoft says it covers its Arizona electricity through a power purchase agreement with the Sun Streams 2 solar project. That is a contract, not a documented physical connection. Backup generators run on what Microsoft calls a renewable biofuel.

  • 202 MW IT power, Epoch AI estimate from satellite imagery and a cooling model
  • About 205,000 H100 equivalents Compute, Epoch AI estimate

Cooling

Microsoft's October 2025 fact sheet says existing facilities use direct evaporative cooling, which "uses water for cooling less than 40% of the year," and future ones will use air-cooled chillers. Under the 2023 city agreement, as reported, only the first three buildings may be water-cooled and later ones must use air cooling. Epoch AI counts 80 air-cooled chiller units from imagery, an estimate that doesn't fit "existing facilities" being all evaporative, so the current mix is unclear.

Water

Microsoft says it buys water in Arizona from EPCOR and the City of Goodyear (not broken out by site). No measured water use is public: Goodyear's spokesperson said in 2024 that Microsoft's water use information "is proprietary to Microsoft and cannot be shared by the city." Figures below are limits and projections, not measurements.

Community

Wastewater forced the change: the Phoenix Business Journal reported in March 2023 that the city lacked sewer line and plant capacity for more of Microsoft's wastewater. A city report quoted there says the existing line "was never intended to take industrial discharges from Microsoft's operations."

Goodyear's council unanimously approved an updated agreement on March 6, 2023: Microsoft pays $36 million toward an estimated $90 million expansion of the 157th Avenue wastewater plant and gets 1.2 million gallons a day of plant capacity at full build-out. The report also says the first plan, water cooling across the whole campus, would have needed up to 5 million gallons a day. Until new capacity arrives, the city allows up to 500,000 gallons of wastewater a day.

The Register reported in April 2023 that the city's account says Microsoft repeatedly delayed building required wastewater systems, and that Goodyear's water services director said the city sought financial assurances because of that record.

The Atlantic's projection of up to 56 million gallons a year at full build-out, as relayed by a local newspaper in April 2024. The same report says city documents suggest that could be optimistic, given the 1.2 million gallons a day capacity. Not a measured figure.

Notes

Listed in Epoch AI's AI data center directory, which labels OpenAI a "likely" user. Epoch also says Microsoft indicated in May 2026 that its MAI-Thinking-1 model was trained here. These are Epoch's readings, not a Microsoft statement Footprint has read.

Microsoft said in 2019 that its design would use outside air below 85 degrees Fahrenheit and "zero water for cooling for more than half the year." A Microsoft spokesperson said in 2023 that future Phoenix-area sites would "use zero water for cooling all year round." These are company claims.

The dust permit is for road work at the property frontage ("MICROSOFT CORPORATION PHX10-11 DATA CENTER OFFSITE IMPROVEMENTS"), issued April 2020 with the contractor's mailing address on it. It places the project; it says nothing about water.

Related

More in Arizona

Sources

Last checked 2026-11-04.