Helios campus (CoreWeave)

Operating · Documented · Location confirmed

Phase I (133 MW critical IT) delivered in Q2 2026. Phases II and III are contracted and not yet delivered. Galaxy targets rent starting Q2 2027 and 2028.

Operator

Galaxy Digital (Galaxy Helios I LLC). Tenant: CoreWeave

Location

984 County Road 112, Afton, TX

Dickens County, about 60 miles from Lubbock. The state filing gives ZIP 79920, while the geocoder's match is 79220. The point is the address, not the 2,200-acre campus.

Power

  • Design capacity: 800 MW
  • Requested grid capacity: 1,630 MW
  • Estimated electrical use: 132 MW (Epoch AI estimate)

TCEQ's review says 120 Caterpillar 3516E diesel generators would produce about 251 MW during outages, with normal use limited to periodic testing.

  • 132 MW now, 528 MW projected IT power, Epoch AI estimate

Power connection

Grid: Galaxy describes its "privately owned 345 kV grid connected substation", with up to 900 MW of transformer capacity, and says the Pitchfork and Cottonwood 345 kV substations owned by Wind Energy Transmission of Texas carry wind power to the area. No wind farm is named, so none is linked here.

Cooling

Chillers supply direct-liquid cooling, per Galaxy.

Water

On-site groundwater, with treatment on site, per Galaxy: "on-site groundwater facilities that provide raw groundwater". The state filing lists a water treatment building.

Notes

Formerly a bitcoin mine. Galaxy's filing records impairment charges from converting its Helios mining equipment.

Epoch AI lists OpenAI as a speculative user. Footprint has no document for this.

Related

More in Texas

Sources

Last checked 2026-11-04.