Colossus 1

Operating · Documented · Location confirmed

Operator

xAI (SpaceXAI). Air permit holder: CTC Property LLC, an xAI affiliate

Location

3231 Paul R. Lowry Road, Memphis, TN 38109

Frank C. Pidgeon Industrial Park, southwest Memphis, Shelby County, Tennessee

Power

  • Requested grid capacity: 300 MW
  • Estimated electrical use: 340 MW (Epoch AI estimate)

MLGW said in May 2025 that the site was receiving 150 MW from the grid through two substations. That is supply as of that date, not measured use.

SpaceX's SEC filing says the first cluster here was about 130 MW of "compute power". That is not total site use. It also says Colossus and Colossus II together provide about 1.0 GW of compute power.

  • 340 MW IT power, Epoch AI estimate

Power connection

Connected to the MLGW/TVA grid through two substations, one existing and one newly built at xAI's expense. SpaceX's SEC filing says the site buys grid power as available and relies on its own generation and Megapack batteries when grid power is curtailed.

On-site generation: 15 natural gas turbines of 16.48 MW each under county air permit No. 01156-01PC, valid July 2, 2025 to January 2, 2027. 247.2 MW combined.

Cooling

Direct-to-chip cooling, per SpaceX's SEC filing. Epoch AI also identifies 33 evaporative cooling towers from satellite imagery.

Water

MLGW public water, from an existing 20-inch main. MLGW's 2024 fact sheet says up to 1 million gallons a day.

Community

Beside Boxtown, a historically Black community in southwest Memphis. Up to 35 turbines were found running before the county permit was issued, according to the NAACP's lawyers, who sent a notice of intent to sue in June 2025.

The NAACP and Young, Gifted & Green appealed the turbine permit in July 2025. The county's Air Pollution Control Board dismissed the appeal as moot in December 2025.

xAI's $80 million water recycling plant, promised to reduce use of the Memphis Sand Aquifer, was paused in 2026. Memphis's mayor says xAI committed to restart construction by the first quarter of 2027.

Notes

In May 2026 SpaceX entered cloud services agreements giving Anthropic access to computing capacity across Colossus and Colossus II, according to its SEC filing. Anthropic makes Claude, the AI used to compile these records.