Under construction · Documented · Location approximate
Meta said in October 2025 that construction was well underway. Epoch AI's satellite timeline shows the roofs of buildings 1 and 2 finished by April 2026 and no IT power running yet. The expansion's power plan is not approved. Footprint had a Dec. 16, 2026 date for the commission to consider it; WWNO reported on Nov. 9 that Entergy plans to seek the approvals at the commission's Dec. 10 meeting. The commission's website lists no December meeting yet.
Meta. A joint venture with funds managed by Blue Owl Capital (80%) and Meta (20%) develops the campus, and Meta leases it. Entergy's customers of record are Meta subsidiaries Laidley LLC and, for the expansion, Evest LLC
Franklin Farms site near Holly Ridge, about 30 miles east of Monroe, Richland Parish, Louisiana. The point marks the Holly Ridge community, not the campus. No source read gives the parcel.
Entergy Louisiana's CEO testified in October 2026 that Meta's power use for the expanded data center is 4,500 MW, The Advocate reports. It calls this the first time Entergy disclosed the figure. Footprint has not read the transcript.
Meta describes 5 GW of "computing capacity" for the expanded campus. That is a compute figure, not a documented electrical load.
Earlier figures: Meta said in February 2025 the site would have about 2 GW of server capacity, plus power for cooling and offices. Epoch AI cites a MISO plan for a load of about 1.8 GW and S&P Global for a 2.064 GW campus. Footprint read these on the news and Epoch pages, not the originals.
In July 2026 a judge's subpoena sought Meta's evidence for how much electricity the site needs. The commission voted 3-1 to reverse the ruling and vacate the subpoena.
Approved: Entergy Louisiana serves the data center through Meta subsidiary Laidley LLC under Order U-37425, issued Aug. 29, 2025. It covers three combined-cycle gas units, two near the site and one at Waterford near Killona. Each is 754 MW nameplate, 2,262 MW combined, according to a filing by two intervenors.
Approved transmission: six customer-funded substations on the site at Franklin Farms, fed by eight 230 kV lines from a new Smalling Substation beside the Baxter-Wilson to Perryville 500 kV line. Also two 30-mile 500 kV lines from a new Car Gas Road switching station, and a separate 60-mile Mount Olive to Sarepta 500 kV line.
Construction power: Entergy says it finished work supplying 10 MW to the site in April 2025.
Proposed, not approved: Entergy applied March 26, 2026 in Docket U-37882 to add 5,278 MW of generation, plus batteries and transmission, for Evest LLC's data center next to the Laidley site. News reports describe seven units of about 754 MW, four near the campus and three near Big Cajun in Pointe Coupee Parish.
Epoch AI identifies air-cooled chillers, with 816 projected by Q1 2028. Epoch's April 2026 timeline says cooling on buildings 1 and 2 was at an advanced stage of installation. A Meta manager says the servers can take up to 96 F before cooling is needed.
Lawsuit over the fast-track rule: on Nov. 9, 2026, the Louisiana Landowners Coalition, Louisiana Citizen Advocacy Group and Save My Louisiana sued the Public Service Commission in the 19th Judicial District Court in East Baton Rouge Parish. They say the commission adopted its "Lightning Directive", which Entergy invoked for this expansion, without proper public notice, and ask the court to declare it invalid. WWNO describes them as landowners whose land Entergy wants for about 80 miles of planned lines from LaSalle Parish to the campus.
Disclosure dispute: the Alliance for Affordable Energy and Union of Concerned Scientists appealed the commission's subpoena reversal in September 2026, calling it arbitrary and capricious, according to their lawyers. No ruling was found.
Cost dispute: Entergy says Meta will pay the full cost of serving the site and projects about $2.65 billion in benefits to other customers over 20 years. Opposing experts testified that a 3.5% deviation from Entergy's assumptions would erase those benefits.
Approval vote: the commission approved the first settlement 4-1 in August 2025, with Commissioner Davante Lewis opposed.
Air permit dispute: LDEQ approved a minor source permit for 31 diesel emergency generators in July 2025. In January 2026 Laidley applied to add 44 fossil-fuel water boilers. Sierra Club, a party to the dispute, says the draft shows 96.83 tons a year of NOx and 98.94 of CO, and that the site should need a stricter major source permit. Footprint has not read the permit or a final decision.
Gas plant hearing: about 30 people attended an LDEQ hearing on Oct. 1, 2026 on Entergy's Richland Parish 3 and 4 Power Station. Residents raised air and water quality. The article does not tie the plant to Meta by name.
Housing and traffic: WAFB reports an estimated 4,000 new people in a parish of about 20,000, one rental rising from about $600-$700 to $2,500 a month, some longtime residents displaced, and construction zones along major roads.
Taxes: state leaders cite over $2 billion in property taxes. The parish assessor expects about $30 million from Meta over three years, after state incentives, WAFB reports.
Water: a Meta manager says yearly use will be "roughly the same number of gallons" as the roughly 2,500 acres of irrigated farmland once on the site. Meta says it will return 100% of consumption through watershed restoration projects. These are company claims, with no figure given.
Meta's stated cost has moved: $10 billion in December 2024 reports, about $27 billion in total development costs in October 2025, more than $50 billion, as reported in August 2026.
Ownership: Blue Owl funds put in about $7 billion and hold 80%. Meta has a four-year lease with extension options and a residual value guarantee for the first 16 years.
Intervenors say joint venture Beignet Investor LLC now owns Laidley, and asked the commission to investigate. This is their claim, in a motion filed January 2026.
The expansion is filed under Evest LLC, on a site the commission's order calls adjacent to Laidley's. Footprint treats both as one campus, as news coverage does.
Last checked 2026-11-11.