All states

Data centers in Louisiana

See Louisiana on the map

14 sites · 1 researched · 2 local bans or limits in effect

Temporary data center bans are often called moratoriums.

Local bans and limits in effect

Failed, retracted or expired (1)

Researched sites

Listed sites, largest first

Articles

In the news

  • Meta Hyperion: Under construction at Holly Ridge; chips owned and used by Meta, per Epoch AI. Meta claims 5 GW once complete (planned capacity); Epoch AI says there is no concrete evidence of that at the Holly Ridge site alone. 10 gas plants totalling about 7.5 GW (on-site and utility generation planned), with 2.5 GW of renewables, per The Lens citing Fortune. The site grew from 2,250 acres to 3,650 acres, per The Lens. Blue Owl owns 80% and Meta 20% of the $27 billion venture. On Nov. 9, 2026, three groups including the Louisiana Landowners Coalition sued the Public Service Commission over the fast-track rule Entergy is using for the expansion's seven gas plants, per WWNO; Entergy plans to seek those approvals at a Dec. 10 meeting, WWNO reports. source 1 · source 2 · source 3 · source 4
  • Hut 8 River Bend: Hut 8 signed a 15-year, $7 billion lease with Fluidstack; at least 245 MW and up to 2,295 MW for Anthropic (contracted and optional capacity). source 1

Researched sites are Footprint's records. Listed sites and local rules: data provided by FracTracker Alliance (2026), accessed via fractracker.org/data-centers, shown as published and not reviewed by Footprint. These lists don't cover every data center.