STACK NVA02

Operating · Documented · Location confirmed

Operator

STACK Infrastructure. Air permit holder: SI NVA02D, LLC

Location

9590 Hornbaker Road, Manassas, VA 20109

Prince William County

Power

  • Design capacity: 420 MW
  • Estimated electrical use: 85 MW (Epoch AI estimate)

The state permit lists 44 emergency diesel generators, most rated 3,000 kW each.

  • 85 MW IT power now, Epoch AI estimate
  • 348 MW IT power by Q1 2028, Epoch AI projection

Power connection

The operator says the campus is supported by two dedicated 300 MW on-site substations from Northern Virginia Electric Cooperative (NOVEC).

Cooling

Air-cooled chillers, as identified by Epoch AI from satellite imagery

Notes

Listed by Epoch AI as an AI data center. Who uses it isn't known.