All states

Data centers in Virginia

See Virginia on the map

466 sites · 9 researched · 12 local bans or limits in effect · 4 proposed

Temporary data center bans are often called moratoriums.

Local bans and limits in effect

Proposed bans and limits

Researched sites

Listed sites, largest first

Show all 457

Upcoming dates

  • By end of 2028: Vantage VA2's turbines could come out
  • No date found: Microsoft's $2.5 million Virginia order awaits finalizing
  • No date found: Rezoning of Amazon's GW Ashburn site

Articles

In the news

  • Vantage VA2: Powered by eight gas turbines on an 18-acre campus in Sterling, per NPR; residents report constant noise. Described as Virginia's only data center supported directly by on-site gas turbines; seven run regularly, and Vantage hopes to bring one offline using a lower-voltage line. Vantage touts $15 million in noise mitigation. Runs entirely on turbines until it can connect to the grid, per KSL. source 1 · source 2 · source 3
  • Google Botetourt: The water authority says it will refuse more than 2 million gallons a day; the contract allows Google to request up to 8 million. Google bought a 312-acre parcel at the Botetourt Center at Greenfield for about $14.06 million. The first building will use air cooling instead of water cooling, per the county. source 1 · source 2 · source 3

Researched sites are Footprint's records. Listed sites and local rules: data provided by FracTracker Alliance (2026), accessed via fractracker.org/data-centers, shown as published and not reviewed by Footprint. These lists don't cover every data center.