Data centers in New Mexico

See New Mexico on the map

10 sites · 0 researched · 2 local bans or limits in effect

Temporary data center bans are often called moratoriums.

Local bans and limits in effect

Listed sites, largest first

Articles

In the news

  • Project Jupiter: Under construction, developed by STACK Infrastructure with four large buildings; Epoch AI projects 2.2 GW by Q4 2028 (estimate). To be powered by up to 2.45 GW of Bloom fuel cells (on-site generation), per Epoch AI. At least four lawsuits were pending in June 2026; one over $165 billion in county bonds was dismissed a second time with leave to refile. Reuters reported an Oracle force-majeure notice tied to the 1,400-acre campus; Oracle says the project remains on schedule, per Data Center Frontier. Air permit: the state's notice says Yucca Growth Infrastructure's YGI Microgrid would use Bloom solid oxide fuel cells "to generate 2,462 MW to power a nearby data center" (planned on-site generation; a revised application caps operation at 1,600 MW, the Albuquerque Journal reports). On Nov. 5-6, 2026, the hearing officer vacated the Dec. 7 permit hearing at the joint request of the developer and the Environment Department, with no new date until the department files a revised recommendation. The developer waived the Nov. 23 decision deadline. New Energy Economy opposed the delay and again sought dismissal, which was denied, the Journal reports. source 1 · source 2 · source 3 · source 4 · source 5 · source 6 · source 7 · source 8

Researched sites are Footprint's records. Listed sites and local rules: data provided by FracTracker Alliance (2026), accessed via fractracker.org/data-centers, shown as published and not reviewed by Footprint. These lists don't cover every data center.