115 sites · 2 researched · 63 local bans or limits in effect · 7 proposed

Temporary data center bans are often called moratoriums.

Local bans and limits in effect

Proposed bans and limits

Researched sites

Listed sites, largest first

Show all 113

Articles

In the news

  • Salem Township Amazon campus: One of two complexes in Amazon's $20 billion Pennsylvania plan, built alongside a nuclear plant that drew federal scrutiny over plugging directly into it. Epoch AI lists AWS Berwick as operating, with Anthropic only a possible user; Cumulus finished a 48 MW first shell in January 2023. source 1 · source 2
  • Homer City Energy Campus: Up to 4.5 GW of gas-fired generation (planned on-site generation) on the retired 1,884 MW coal plant site, a $10 billion project. A campus of more than 3,200 acres, with seven GE Vernova turbines; April 2025 reports expected power by 2027. source 1 · source 2
  • Project Gravity: A seven-building campus on 186 acres of mine-spoiled land between Business Route 6 and Eynon-Jermyn Road. Removed from Pennsylvania's permit fast track program in 2026. Residents are resisting plans for six data center campuses in Archbald, per NPR. source 1 · source 2